Skip to main content

REMINDER: Roadworks: Peter Row, Dublin 8

  • Issued on: 03/02/2025, 09:20
  • Summary: Roadworks report by DCC: Peter Row, Dublin 8. Full details available at https://alerts.dublincity.ie/r?ref=T298C
  • Category: Road Alert

A request has been received from the City Council's Road Maintenance Division for the temporary closure of the following road to facilitate carriageway resurfacing on the dates and times listed below:

Location
Peter Row (from Angier Street And Junction with Wood Street/Whitefriar Street), Dublin 8

Time
06.00hrs to 18.30hrs each day

Date
Tuesday 4th February 2025 and Thursday 6th February 2025

Traffic Management Plan
  • Pedestrian access will be facilitated at all times.
  • Local access will be facilitated when possible from all closure points.
  • Traffic Controllers to be located at junction with Peter Row and Aungier Street and at the junction with Whitefriar Street And Peter Street.
  • Also at the Junction of Peter Street and Bride Street.
  • Residents to be notified in advance of these roadworks and TM system to be put in place.
  • Site Access/Egress signs and location/directional signs will be positioned to suit progress of works.
  • Northbound traffic arriving from Angier's Street will be diverted to Longford Street Little – Whitefriar Street
  • Southbound traffic arriving from Whitefriar Street will be diverted to Wood Street – Whitefriar Street – Stephens Street Upper – Aungier Street.